(Created page with "{{DISPLAYTITLE:XI.M2 (NUREG 1801 R2)}} Return to AMP Table '''XI.M2 WATER CHEMISTRY''' '''Program Description''' The main objective of this program is to mitigate loss of material due to corrosion, cracking due to stress corrosion cracking (SCC) and related mechanisms, and reduction of heat transfer due to fouling in components exposed to a treated water environment. The program includes periodic monitoring of the treated water in order...")
 
m (1 revision imported: Initial page creation)
(No difference)

Revision as of 19:12, 4 October 2024

Return to AMP Table

XI.M2 WATER CHEMISTRY

Program Description

The main objective of this program is to mitigate loss of material due to corrosion, cracking due to stress corrosion cracking (SCC) and related mechanisms, and reduction of heat transfer due to fouling in components exposed to a treated water environment. The program includes periodic monitoring of the treated water in order to minimize loss of material or cracking.

The water chemistry program for boiling water reactors (BWRs) relies on monitoring and control of reactor water chemistry based on industry guidelines contained in the Boiling Water Reactor Vessel and Internals Project (BWRVIP)-190 (Electric Power Research Institute [EPRI] 1016579)(Archived). The BWRVIP-190(Archived) has three sets of guidelines: one for reactor water, one for condensate and feedwater, and one for control rod drive (CRD) mechanism cooling water. The water chemistry program for PWRs relies on monitoring and control of reactor water chemistry based on industry guidelines contained in EPRI 1014986 (PWR Primary Water Chemistry Guidelines-Revision 6)(Archived) and EPRI 1016555 (PWR Secondary Water Chemistry Guidelines- Revision 7)(Archived).

The water chemistry programs are generally effective in removing impurities from intermediate and high flow areas. The Generic Aging Lessons Learned (GALL) report identifies those circumstances in which the water chemistry program is to be augmented to manage the effects of aging for license renewal. For example, the water chemistry program may not be effective in low flow or stagnant flow areas. Accordingly, in certain cases as identified in the GALL Report, verification of the effectiveness of the chemistry control program is undertaken to ensure that significant degradation is not occurring and the component’s intended function is maintained during the period of extended operation. For these specific cases, an acceptable verification program is a one-time inspection of selected components at susceptible locations in the system.

Evaluation and Technical Basis

1. Scope of Program: The program includes components in the reactor coolant system, the engineered safety features, the auxiliary systems, and the steam and power conversion system. This program addresses the metallic components subject to aging management review that are exposed to a treated water environment controlled by the water chemistry program.
2. Preventive Actions: The program includes specifications for chemical species, impurities and additives, sampling and analysis frequencies, and corrective actions for control of reactor water chemistry. System water chemistry is controlled to minimize contaminant concentration and mitigate loss of material due to general, crevice, and pitting corrosion and cracking caused by SCC. For BWRs, maintaining high water purity reduces susceptibility to SCC, and chemical additive programs such as hydrogen water chemistry, or noble metal chemical application also may be used. For PWRs, additives are used for reactivity control and to control pH and inhibit corrosion.
3. Parameters Monitored/Inspected: The concentrations of corrosive impurities listed in the EPRI water chemistry guidelines are monitored to mitigate loss of material, cracking, and reduction of heat transfer. Water quality also is maintained in accordance with the guidance. Chemical species and water quality are monitored by in-process methods or through sampling. The chemical integrity of the samples is maintained and verified to ensure that the method of sampling and storage will not cause a change in the concentration of the chemical species in the samples.
4. Detection of Aging Effects: This is a mitigation program and does not provide for detection of any aging effects of concern for the components within its scope. The monitoring methods and frequency of water chemistry sampling and testing is performed in accordance with the EPRI water chemistry guidelines and based on plant operating conditions. The main objective of this program is to mitigate loss of material due to corrosion and cracking due to SCC in components exposed to a treated water environment.
5. Monitoring and Trending: Chemistry parameter data are recorded, evaluated, and trended in accordance with the EPRI water chemistry guidelines.
6. Acceptance Criteria: Maximum levels for various chemical parameters are maintained within the system-specific limits as indicated by the limits specified in the corresponding EPRI water chemistry guidelines.
7. Corrective Actions: Any evidence of aging effects or unacceptable water chemistry results are evaluated, the cause identified, and the condition corrected. When measured water chemistry parameters are outside the specified range, corrective actions are taken to bring the parameter back within the acceptable range (or to change the operational mode of the plant) within the time period specified in the EPRI water chemistry guidelines. Whenever corrective actions are taken to address an abnormal chemistry condition, increased sampling or other appropriate actions may be used to verify the effectiveness of these actions. As discussed in the Appendix for GALL, the staff finds the requirements of 10 CFR Part 50, Appendix B, acceptable to address the corrective actions.
8. Confirmation Process: Following corrective actions, additional samples are taken and analyzed to verify that the corrective actions were effective in returning the concentrations of contaminants, such as chlorides, fluorides, sulfates, dissolved oxygen, and hydrogen peroxide, to within the acceptable ranges. As discussed in the Appendix for GALL, the staff finds the requirements of 10 CFR Part 50, Appendix B, acceptable to address the confirmation process.
9. Administrative Controls: Site quality assurance procedures, review and approval processes, and administrative controls are implemented in accordance with the requirements of 10 CFR Part 50, Appendix B. As discussed in the Appendix for GALL, the staff finds the requirements of 10 CFR Part 50, Appendix B, acceptable to address administrative controls.
10. Operating Experience: The EPRI guideline documents have been developed based on plant experience and have been shown to be effective over time with their widespread use. The specific examples of operating experience are as follows:
BWR: Intergranular stress corrosion cracking (IGSCC) has occurred in small- and large-diameter BWR piping made of austenitic stainless steels and nickel-base alloys. Significant cracking has occurred in recirculation, core spray, residual heat removal systems, and reactor water cleanup system piping welds. IGSCC has also occurred in a number of vessel internal components, including core shroud, access hole cover, top guide, and core spray spargers (US Nuclear Regulatory Commission (NRC) Information Bulletin 80-13, US NRC Information Notice (IN) 95-17, US NRC Generic Letter (GL) 94-03, and NUREG-1544). No occurrence of SCC in piping and other components in standby liquid control systems exposed to sodium pentaborate solution has ever been reported (NUREG/CR-6001).
PWR Primary System: The potential for SCC-type mechanisms might normally occur because of inadvertent introduction of contaminants into the primary coolant system, including contaminants introduced from the free surface of the spent fuel pool (which can be a natural collector of airborne contaminants) or the introduction of oxygen during plant cooldowns (US NRC IN 84-18). Ingress of demineralizer resins into the primary system has caused IGSCC of Alloy 600 vessel head penetrations (US NRC IN 96-11, US NRC GL 97-01). Inadvertent introduction of sodium thiosulfate into the primary system has caused IGSCC of steam generator tubes. SCC has occurred in safety injection lines (US NRC INs 97-19 and 84-18), charging pump casing cladding (US NRC INs 80-38 and 94-63), instrument nozzles in safety injection tanks (US NRC IN 91-05), and safety-related SS piping systems that contain oxygenated, stagnant, or essentially stagnant borated coolant (US NRC INs 97-19). Steam generator tubes and plugs and Alloy 600 penetrations have experienced primary water stress corrosion cracking (US NRC INs 89-33, 94-87, 97-88, 90-10, and 96-11; US NRC Bulletin 89-01 and its two supplements). IGSCC-induced circumferential cracking has occurred in PWR pressurizer heater sleeves (US NRC IN 2006-27).
PWR Secondary System: Steam generator tubes have experienced ODSCC, IGA, wastage, and pitting (US NRC IN 97-88, US NRC GL 95-05). Carbon steel support plates in steam generators have experienced general corrosion. The steam generator shell has experienced pitting and stress corrosion cracking (US NRC INs 82-37, 85-65, and 90-04). Extensive buildup of deposits at steam generator tube support holes can result in flow-induced vibrations and tube cracking (US NRC IN 2007-37).
Such operating experience has provided feedback to revisions of the EPRI water chemistry guideline documents.

References

10 CFR Part 50, Appendix B, Quality Assurance Criteria for Nuclear Power Plants, Office of the Federal Register, National Archives and Records Administration, 2009.

BWRVIP-190 (EPRI 1016579), BWR Vessel and Internals Project: BWR Water Chemistry Guidelines-2008 Revision,(Archived) Electric Power Research Institute, Palo Alto, CA, October 2008.

EPRI 1016555, PWR Secondary Water Chemistry Guidelines–Revision 7,(Archived) Electric Power Research Institute, Palo Alto, CA, February 2009.

EPRI 1014986, PWR Primary Water Chemistry Guidelines, Revision 6, Volumes 1 and 2,(Archived) Electric Power Research Institute, Palo Alto, CA, December 2007.

US NRC IE Bulletin 89-01, Failure of Westinghouse Steam Generator Tube Mechanical Plugs, U.S. Nuclear Regulatory Commission, May 15, 1989.

US NRC IE Bulletin 89-01, Supplement 1, Failure of Westinghouse Steam Generator Tube Mechanical Plugs, U.S. Nuclear Regulatory Commission, November 14, 1989.

US NRC IE Bulletin 89-01, Supplement 2, Failure of Westinghouse Steam Generator Tube Mechanical Plugs, U.S. Nuclear Regulatory Commission, June 28, 1991.

US NRC Generic Letter 94-03, Intergranular Stress Corrosion Cracking of Core Shrouds in Boiling Water Reactors, U.S. Nuclear Regulatory Commission, July 25, 1994.

US NRC Generic Letter 95-05, Voltage-Based Repair Criteria for Westinghouse Steam Generator Tubes Affected by Outside Diameter Stress Corrosion Cracking, U.S. Nuclear Regulatory Commission, August 3, 1995.

US NRC Generic Letter 97-01, Degradation of Control Rod Drive Mechanism Nozzle and Other Vessel Closure Head Penetrations, U.S. Nuclear Regulatory Commission, April 1,1997.

US NRC Information Notice 80-38, Cracking in Charging Pump Casing Cladding, U.S. Nuclear Regulatory Commission, October 31, 1980.

US NRC Information Notice 82-37, Cracking in the Upper Shell to Transition Cone Girth Weld of a Steam Generator at an Operating PWR, U.S. Nuclear Regulatory Commission, September 16, 1982.

US NRC Information Notice 84-18, Stress Corrosion Cracking in PWR Systems, U.S. Nuclear Regulatory Commission, March 7, 1984.

US NRC Information Notice 85-65, Crack Growth in Steam Generator Girth Welds, U.S. Nuclear Regulatory Commission, July 31, 1985.

US NRC Information Notice 89-33, Potential Failure of Westinghouse Steam Generator Tube Mechanical Plugs, U.S. Nuclear Regulatory Commission, March 23, 1989.

US NRC Information Notice 90-04, Cracking of the Upper Shell-to-Transition Cone Girth Welds in Steam Generators, U.S. Nuclear Regulatory Commission, January 26, 1990.

US NRC Information Notice 90-10, Primary Water Stress Corrosion Cracking (PWSCC) of Inconel 600, U.S. Nuclear Regulatory Commission, February 23, 1990.

US NRC Information Notice 91-05, Intergranular Stress Corrosion Cracking in Pressurized Water Reactor Safety Injection Accumulator Nozzles, U.S. Nuclear Regulatory Commission, January 30, 1991.

US NRC Information Notice 94-63, Boric Acid Corrosion of Charging Pump Casing Caused by Cladding Cracks, U.S. Nuclear Regulatory Commission, August 30, 1994.

US NRC Information Notice 94-87, Unanticipated Crack in a Particular Heat of Alloy 600 Used for Westinghouse Mechanical Plugs for Steam Generator Tubes, U.S. Nuclear Regulatory Commission, December 22, 1994.

US NRC Information Notice 95-17, Reactor Vessel Top Guide and Core Plate Cracking, U.S. Nuclear Regulatory Commission, March 10, 1995.

US NRC Information Notice 96-11, Ingress of Demineralizer Resins Increase Potential for Stress Corrosion Cracking of Control Rod Drive Mechanism Penetrations, U.S. Nuclear Regulatory Commission, February 14, 1996.

US NRC Information Notice 97-19, Safety Injection System Weld Flaw at Sequoyah Nuclear Power Plant, Unit 2, U.S. Nuclear Regulatory Commission, April 18, 1997.

US NRC Information Notice 97-88, Experiences During Recent Steam Generator Inspections, U.S. Nuclear Regulatory Commission, December 16, 1997.

US NRC Information Notice 2006-27, Circumferential Cracking in the Stainless Steel Pressurizer Heater Sleeves of Pressurized Water Reactors, December 11, 2006.

US NRC Information Notice 2007-37, Buildup of Deposits in Steam Generators, November 23, 2007.

NUREG-1544, Status Report. Intergranular Stress Corrosion Cracking of BWR Core Shrouds and Other Internal Components, U.S. Nuclear Regulatory Commission, March 1996.

NUREG/CR-6001, Aging Assessment of BWR Standby Liquid Control Systems, G. D. Buckley, R. D. Orton, A. B. Johnson Jr., and L. L. Larson, 1992.