XI.M16 (NUREG-1801 R0)

From EPRI Nuclear LTO Wiki
Jump to navigation Jump to search

Return to AMP Table

XI.M16 PWR VESSEL INTERNALS

Program Description

The program includes (a) augmentation of the inservice inspection (ISI) in accordance with the American Society of Mechanical Engineers (ASME) Code, Section Xl, Subsection IWB, Table IWB 2500-1 (1995 edition through the 1996 addenda) for certain susceptible or limiting components or locations, and (b) monitoring and control of reactor coolant water chemistry in accordance with the Electric Power Research Institute (EPRI) guidelines in TR-105714(Archived) to ensure the long-term integrity and safe operation of pressurized water reactor (PWR) vessel internal components. The ASME Section Xl ISI is augmented with enhancing the VT-1 examinations for non-bolted components for example, to include the ability to achieve a 0.0005inch resolution. The inspection methods for bolted components are to be demonstrated for detecting cracks between the bolt head and the shank.


Evaluation and Technical Basis

1. Scope of Program: The program is focused on managing the effects of crack initiation and growth due to stress corrosion cracking (SCC) or irradiation assisted stress corrosion cracking (IASCC), and loss of fracture toughness due to neutron irradiation embrittlement or void swelling. The program contains preventive measures to mitigate SCC or IASCC; ISI to monitor the effects of cracking on the intended function of the components; and repair and/or replacement as needed to maintain the ability to perform the intended function. Loss of fracture toughness is of consequence only if cracks exist. Cracking is expected to initiate at the surface and is detectable by augmented inspection.
The program provides guidelines to assure safety function integrity of the subject safety-related reactor pressure vessel internal components, both non-bolted and bolted components. The program consists of the following elements: (a) identify the most susceptible or limiting items, (b) develop appropriate inspection techniques to permit detection and characterizing of the feature (cracks) of interest and demonstrate the effectiveness of the proposed technique, and (c) implement the inspection during the license renewal term. For example, appropriate inspection techniques may include enhancing visual VT-1 examinations for non-bolted components and demonstrated acceptable inspection methods for bolted components.
2. Preventive Actions: The requirements of ASME Section XI, Subsection IWB, provide guidance on detection, but do not provide guidance on methods to mitigate cracking. Maintaining high water purity reduces susceptibility to cracking due to SCC. Reactor coolant water chemistry is monitored and maintained in accordance with the EPRI guidelines in TR-105714(Archived). The program description and evaluation and technical basis of monitoring and maintaining reactor water chemistry are presented in Chapter XI.M2, 'Water Chemistry."
3. Parameters Monitored/Inspected: The program monitors the effects of cracking on the intended function of the component by detection and sizing of cracks by augmentation of ISI in accordance with the requirements of the ASME Code, Section XI, Table IWB 2500-1.
4. Detection of Aging Effects: The extent and schedule of the inspection and test techniques prescribed by the aging management program are designed to maintain structural integrity and ensure that aging effects will be discovered and repaired before the loss of intended function. Inspection can reveal crack initiation and growth. Vessel internal components are inspected in accordance with the requirements of ASME Section XI, Subsection IWB, examination category B-N-3 for all accessible surfaces of reactor core support structure that can be removed from the vessel. The ASME Section Xl inspection specifies visual VT-3 examination to determine the general mechanical and structural condition of the component supports by (a) verifying parameters, such as clearances, settings, and physical displacements, and (b) detecting discontinuities and imperfections, such as loss of integrity at bolted or welded connections, loose or missing parts, debris, corrosion, wear, or erosion.
However, visual VT-3 examination is to be augmented to detect tight or fine cracks. Also, historically the VT-3 examinations have not identified bolt cracking because cracking occurs at the juncture of the bolt head and shank, which is not accessible for visual inspection. Creviced and other inaccessible regions are difficult to inspect visually. This AMP recommends more stringent inspections such as enhanced visual VT-1 examinations or ultrasonic methods of volumetric inspection, for certain selected components and locations.
The inspection technique is capable of detecting the critical flaw size with adequate margin. The critical flaw size is determined based on the service loading condition and service-degraded material properties. For non-bolted components, augmented ISI may include enhancement of the visual VT-1 examination of Section Xl IWA-221 0. A description of such an enhanced visual VT-1 examination should include the ability to achieve a 0.0005-in. resolution, with the conditions (e.g., lighting and surface cleanliness) of the inservice examination bounded by those used to demonstrate the resolution of the inspection technique. For bolted components, augmented ISI is to include other demonstrated acceptable inspection methods to detect cracks between the bolt head and the shank. Alternatively, the applicant may perform a component-specific evaluation, including a mechanical loading assessment to determine the maximum tensile loading on the component during ASME Code Level A, B, C, and D conditions. If the loading is compressive or low enough (<5 ksi) to preclude fracture, then supplemental inspection of the component is not required. Failure to meet this criterion requires continued use of the augmented inspection methods.
5. Monitoring and Trending: Inspection schedules in accordance with IWB-2400, assessment of susceptible or limiting components or locations, and reliable examination methods provide timely detection of cracks. The scope of examination expansion and reinspection beyond the baseline inspection are required if flaws are detected.
6. Acceptance Criteria: Any indication or relevant condition of degradation is evaluated in accordance with IWB-31 00 by comparing ISI results with the acceptance standards of IWB3400 and IWB-3500.
7. Corrective Actions: Repair and replacement procedures are equivalent to those requirements in ASME Section Xi. Repair is in conformance with IWB-4000 and replacement occurs according to IWB-7000. As discussed in the appendix to this report, the staff finds the requirements of 10 CFR Part 50, Appendix B, acceptable in addressing corrective actions.
8. Confirmation Process: Site quality assurance (QA) procedures, review and approval processes, and administrative controls are implemented in accordance with the requirements of 10 CFR Part 50, Appendix B. As discussed in the appendix to this report, the staff finds the requirements of 10 CFR Part 50, Appendix B, acceptable in addressing the confirmation process and administrative controls.
9. Administrative Controls: See Item 8, above.
10. Operating Experience: Because the ASME Code is a consensus document that has been widely used over a long period, it has been shown to be generally effective in managing aging effects in Class 1, 2, or 3 components and their integral attachments in light-water cooled power plants.
In PWRs, stainless steel components have generally not been found to be affected by SCC because of low dissolved oxygen levels and control of primary water chemistry. However, the potential for SCC exists due to inadvertent introduction of contaminants into the primary coolant system from unacceptable levels of contaminants in the boric acid; introduction through the free surface of the spent fuel pool, which can be a natural collector of airborne contaminants (US NRC IN 84-18); introduction of relatively high levels of oxygen during shutdown, or from aggressive chemistries that may develop in creviced regions. Cracking has occurred in SS baffle former bolts in a number of foreign plants (US NRC IN 98-11) and has now been observed in plants in the United States.


References

ASME Section XI, Rules for Inservice Inspection of Nuclear Power Plant Components, ASME Boiler and Pressure Vessel Code, 1995 edition through the 1996 addenda, American Society of Mechanical Engineers, New York, NY.

EPRI TR-105714(Archived), PWR primary Water Chemistry Guidelines-Revision 3, Electric Power Research Institute, Palo Alto, CA, November 1995.

US NRC Information Notice 84-18, Stress Corrosion Cracking in PWR Systems, March 7, 1984.

US NRC Information Notice 98-11, Cracking of Reactor Vessel Internal Baffle Former Bolts in Foreign Plants, March 25, 1998.