Program Description

This program includes (a) enhanced inservice inspection (ISI) in conformance with the American Society of Mechanical Engineers (ASME) Code, Section Xl, Subsection IWB, Table IWB 2500-1 (1995 edition through the 1996 addenda) and the recommendations of NUREG-0619, and (b) system modifications and maintenance programs to mitigate cracking. The program specifies periodic liquid penetrant and ultrasonic inspection of critical regions of boiling water reactor (BWR) control rod drive return line (CRDRL) nozzle.


Evaluation and Technical Basis

1. Scope of Program: The program includes systems modifications, enhanced ISI, and maintenance programs to monitor the effects of crack initiation and growth on the intended function of CRDRL nozzles.
2. Preventive Actions: Mitigation occurs by system modifications, such as rerouting the CRDRL to a system that connects to the reactor vessel. For some classes of BWRs, or those that can prove satisfactory system operation, mitigation also is accomplished by confirmation of proper return flow capability, two-pump operation and cutting and capping the CRDRL nozzle without rerouting.
3. Parameters Monitored/Inspected: The aging management program (AMP) monitors the effects of cracking on the intended function of the component by detecting and sizing cracks by ISI in accordance with Table IWB 2500-1 and NUREG-0619.
4. Detection of Aging Effects: The extent and schedule of inspection, as delineated in NUREG 0619, assures detection of cracks before the loss of intended function of the component. Inspection recommendations include liquid penetrant testing (PT) of the CRDRL nozzle blend radius and bore regions and the reactor vessel wall area beneath the nozzle, return-flow-capacity demonstration, CRD-system-performance testing and ultrasonic inspection of welded connections in the rerouted line. The inspection is to include base metal to a distance of one-pipe-wall thickness or 0.5 in., whichever is greater, on both sides of the weld.
5. Monitoring and Trending: The inspection schedule of NUREG-0619 provides timely detection of cracks.
6. Acceptance Criteria: Any cracking is evaluated in accordance with IWB-3100 by comparing inspection results with the acceptance standards of IWB-3400 and IWB-3500. All cracks found in the CRDRL nozzles are to be removed by grinding.
7. Corrective Actions: Repair is in conformance with IWB-4000 and replacement in accordance with IWB-7000. As discussed in the appendix to this report, the staff finds the requirements of 10 CFR Part 50, Appendix B, acceptable in addressing corrective actions.
8. Confirmation Process: Site quality assurance (QA) procedures, review and approval processes, and administrative controls are implemented in accordance with the requirements of 10 CFR Part 50, Appendix B. As discussed in the appendix to this report, the staff finds the requirements of 10 CFR Part 50, Appendix B, acceptable in addressing the confirmation process and administrative controls.
9. Administrative Controls: See Item 8, above.
10. Operating Experience: Cracking has occurred in several BWR plants (NUREG-0619). The present AMP has been implemented for nearly 20 years and found to be effective in managing the effect of cracking on the intended function of CRDRL nozzles.


References

10 CFR 50.55a, Codes and Standards, Office of the Federal Register, National Archives and Records Administration, 2000.

ASME Section XI, Rules for Inservice Inspection of Nuclear Power Plant Components, ASME Boiler and Pressure Vessel Code, 1995 edition through the 1996 addenda, American Society of Mechanical Engineers, New York, NY.

NUREG-0619, BWR Feedwater Nozzle and Control Rod Drive Return Line Nozzle Cracking, U.S. Nuclear Regulatory Commission, November 1980.